Business Pattern Analysis
Uncovering hidden capital inefficiencies, utilization imbalances, and transformation opportunities across the fleet
SUM(TotalQty$_PL_USD)Total dollar value of all equipment across your fleet (on-site + yard + repair + damage). Source: yard_inventory table.
SUM(QtyOnSite) / SUM(TotalQty) × 100Percentage of total equipment actively deployed at customer sites vs sitting idle. Higher = better capital efficiency.
Repair$ + Damage$Where Repair$ = (QtyInRepair/TotalQty) × TotalValue and Damage$ = (QtyDamage/TotalQty) × TotalValue. This is capital locked in broken equipment generating zero revenue.
SUM(SurplusValue × 0.30)For branches with <20% utilization, calculates surplus inventory value and takes 30% as conservative transfer estimate. Move equipment from surplus to high-demand locations.
SUM(YardValue) WHERE (QtyInYard/TotalQty) > 60%Sum of inventory value for branch-category positions where more than 60% of equipment sits idle in yards. This is "dead" inventory not generating any revenue.
2. Trapped Capital: $55.5M (2.7%) is locked in repair ($49.9M) and damage ($5.6M) queues — capital that generates zero revenue while accumulating holding costs.
3. Transfer Opportunity: Rebalancing inventory from surplus to constrained branches could unlock an estimated $95.8M in earning potential without new capex.
4. System Fragmentation: 20 items worth $6.1M are tracked across multiple ERPs with >20% cost variance — a hidden procurement tax.
5. Pricing Arbitrage: 20 items totaling $5.2M show >50% regional rate spreads — margin leakage requiring rate harmonization.
| System | Branches | SKUs | Total Qty | Fleet Value | Utilization | Impaired % |
|---|---|---|---|---|---|---|
| Profield | 75 | 8,949 | 61.4M | $1.1B | 59.4% | 1.8% |
|
Loading branch breakdown...
|
||||||
| BAS | 98 | 9,051 | 25.7M | $895.6M | 68.4% | 0.2% |
|
Loading branch breakdown...
|
||||||
| AGF | 5 | 644 | 333.9K | $16.1M | 3.4% | 0.0% |
|
Loading branch breakdown...
|
||||||
| ORACLE | 0 | 26 | 4.9K | $103.0K | 0.0% | 0.0% |
|
Loading branch breakdown...
|
||||||
| JDE | 25 | 54 | 2.0K | $16.5K | 0.1% | 0.2% |
|
Loading branch breakdown...
|
||||||
| Category | Branches | SKUs | Total Qty | Fleet Value | Utilization | Repair % | Concentration |
|---|---|---|---|---|---|---|---|
| Scaffolding System | 155 | 3,523 | 29.7M | $791.8M | 74.8% | 0.1% | |
|
Loading branch breakdown...
|
|||||||
| Universal | 166 | 2,212 | 27.4M | $514.2M | 81.7% | 0.3% | |
|
Loading branch breakdown...
|
|||||||
| Construction Elevator | 76 | 541 | 955.3K | $143.4M | 38.9% | 0.0% | |
|
Loading branch breakdown...
|
|||||||
| Shoring System | 140 | 908 | 7.8M | $124.2M | 46.8% | 2.6% | |
|
Loading branch breakdown...
|
|||||||
| Suspended | 153 | 2,396 | 635.5K | $114.7M | 47.2% | 0.1% | |
|
Loading branch breakdown...
|
|||||||
| Formwork | 80 | 1,742 | 4.3M | $104.0M | 53.0% | 2.9% | |
|
Loading branch breakdown...
|
|||||||
| Grid and Decking | 34 | 305 | 988.1K | $59.7M | 13.6% | 16.1% | |
|
Loading branch breakdown...
|
|||||||
| Beam Formwork | 135 | 372 | 1.2M | $58.3M | 40.6% | 3.6% | |
|
Loading branch breakdown...
|
|||||||
| Mast Climber | 82 | 606 | 99.8K | $47.6M | 24.0% | 0.1% | |
|
Loading branch breakdown...
|
|||||||
| Formwork Accessories | 142 | 1,089 | 13.8M | $26.1M | 14.9% | 2.6% | |
|
Loading branch breakdown...
|
|||||||
| SITE INFRASTRUCTURE & SAFETY | 74 | 81 | 148.4K | $15.2M | 26.0% | 0.9% | |
|
Loading branch breakdown...
|
|||||||
| Material Hoist | 102 | 143 | 39.4K | $13.0M | 51.5% | 0.0% | |
|
Loading branch breakdown...
|
|||||||
| Transport Platform | 78 | 202 | 22.7K | $10.4M | 20.2% | 0.0% | |
|
Loading branch breakdown...
|
|||||||
| Climbing Formwork | 17 | 353 | 260.5K | $8.3M | 35.1% | 0.6% | |
|
Loading branch breakdown...
|
|||||||
| AWP Core | 6 | 27 | 99.0 | $2.5M | 36.4% | 0.0% | |
|
Loading branch breakdown...
|
|||||||
| Material Lifting | 88 | 104 | 1.7K | $1.8M | 25.9% | 0.1% | |
|
Loading branch breakdown...
|
|||||||
| Aerial Work Platforms – Legacy | 9 | 18 | 2.5K | $989.9K | 68.3% | 0.0% | |
|
Loading branch breakdown...
|
|||||||
| None | 6 | 122 | 55.7K | $959.8K | 0.6% | 0.0% | |
|
Loading branch breakdown...
|
|||||||
| AWP Repair Parts | 33 | 59 | 53.2K | $586.4K | 22.9% | 0.0% | |
|
Loading branch breakdown...
|
|||||||
| SHORING SYSTEM | 0 | 13 | 3.0K | $89.5K | 0.0% | 0.0% | |
|
Loading branch breakdown...
|
|||||||
| Branch | Region | Repair Qty | Damaged Qty | Repair Value | Damage Value | Total Fleet | Trapped % |
|---|---|---|---|---|---|---|---|
| Toronto F&S | Canada | 212,341 | 1,204 | $13.6M | $197.8K | $45.6M | 30.2% |
|
Loading category breakdown...
|
|||||||
| Seattle F&S | West | 73,848 | 25,946 | $5.8M | $1.3M | $14.3M | 49.9% |
|
Loading category breakdown...
|
|||||||
| Fontana | West | 92,829 | 8,383 | $6.3M | $662.9K | $17.2M | 40.3% |
|
Loading category breakdown...
|
|||||||
| Great Lakes CC | Northeast | 316,067 | 5,331 | $6.6M | $309.4K | $16.5M | 41.6% |
|
Loading category breakdown...
|
|||||||
| Sacramento Main | West | 35,555 | 4,884 | $3.9M | $482.5K | $15.7M | 28.0% |
|
Loading category breakdown...
|
|||||||
| Vancouver F&S | Canada | 35,804 | 47,432 | $1.9M | $762.7K | $16.2M | 16.8% |
|
Loading category breakdown...
|
|||||||
| Houston F&S | Gulf | 30,654 | 3,341 | $2.0M | $395.9K | $27.0M | 8.8% |
|
Loading category breakdown...
|
|||||||
| Edmonton F&S | Canada | 26,453 | 21,321 | $1.8M | $553.7K | $21.8M | 10.8% |
|
Loading category breakdown...
|
|||||||
| Miami | Southeast & Specialty | 44,460 | 0 | $2.0M | $0 | $11.1M | 18.1% |
|
Loading category breakdown...
|
|||||||
| Engel Holdings - Stanwood | West | 11 | 0 | $1.4M | $0 | $2.0M | 68.8% |
|
Loading category breakdown...
|
|||||||
| Engel Holdings - Fontana | West | 33 | 0 | $911.7K | $0 | $3.4M | 26.5% |
|
Loading category breakdown...
|
|||||||
| Edmonton | Canada | 30,478 | 2 | $766.2K | $37 | $9.6M | 8.0% |
|
Loading category breakdown...
|
|||||||
| SW Boston | Northeast | 135 | 0 | $765.5K | $0 | $806.4K | 94.9% |
|
Loading category breakdown...
|
|||||||
| Fort McMurray | Canada | 21,453 | 7,019 | $410.6K | $102.1K | $49.5M | 1.0% |
|
Loading category breakdown...
|
|||||||
| Montreal F&S | Canada | 30,943 | 1,816 | $280.8K | $220.2K | $2.4M | 20.7% |
|
Loading category breakdown...
|
|||||||
| Linden | Northeast | 1,885 | 3,286 | $103.9K | $115.7K | $11.1M | 2.0% |
|
Loading category breakdown...
|
|||||||
| Atlanta F&S | Southeast & Specialty | 3,857 | 1,117 | $201.7K | $16.6K | $5.0M | 4.4% |
|
Loading category breakdown...
|
|||||||
| Charlotte | Southeast & Specialty | 203 | 0 | $205.6K | $0 | $865.1K | 23.8% |
|
Loading category breakdown...
|
|||||||
| Huntington | Northeast | 6,907 | 644 | $179.7K | $19.9K | $219.0K | 91.1% |
|
Loading category breakdown...
|
|||||||
| Cincinnati | Southeast & Specialty | 4 | 0 | $159.8K | $0 | $1.4M | 11.2% |
|
Loading category breakdown...
|
|||||||
| Branch | Region | On Site | Rent Ready | In Yard | Total Qty | Fleet Value | Utilization |
|---|---|---|---|---|---|---|---|
| DSS | HQ HOB / Other | 0 | 10,810 | 10,810 | 10,914 | $475.7K | 0.0% |
|
Loading category breakdown...
|
|||||||
| Safeworks, LLC (Spider)-60026-E&I | West | 0 | 37 | 37 | 37 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| SW SAN FRANCISCO | West | 0 | 130 | 130 | 130 | $2.4K | 0.0% |
|
Loading category breakdown...
|
|||||||
| Corporate Maintenance | CFO | 0 | 139,026 | 139,026 | 140,967 | $3.4M | 0.0% |
|
Loading category breakdown...
|
|||||||
| R&D | HQ HOB / Other | 0 | 52 | 52 | 52 | $1.8K | 0.0% |
|
Loading category breakdown...
|
|||||||
| Safeworks, LLC (Spider)-60008-C&I | Northeast | 0 | 488 | 488 | 488 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| St.Louis RDC | NA HQ | 0 | 18,463 | 18,463 | 18,463 | $7.5M | 0.0% |
|
Loading category breakdown...
|
|||||||
| Louisville Fulfillment Center | Southeast & Specialty | 0 | 6,701 | 6,701 | 6,751 | $4.8M | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - NEW ORLEANS | Gulf | 0 | 2 | 2 | 2 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| USD Region Offices | NA HQ | 0 | 723,990 | 723,990 | 723,990 | $4.9M | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - ELEVATOR | Southeast & Specialty | 0 | 1 | 1 | 1 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| SW St Louis | Northeast | 0 | 75 | 75 | 75 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - DALLAS | Gulf | 0 | 178 | 178 | 178 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| Jasper Materials | HQ HOB / Other | 0 | 44,642 | 44,642 | 45,980 | $376.7K | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - CHARLOTTE | Southeast & Specialty | 0 | 10 | 10 | 14 | $10.9K | 0.0% |
|
Loading category breakdown...
|
|||||||
| Carolina Commercial | Southeast & Specialty | 0 | 6,917 | 6,917 | 6,930 | $3.6M | 0.0% |
|
Loading category breakdown...
|
|||||||
| Saskatchewan | Canada | 0 | 267 | 267 | 267 | $17.5K | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - PENSACOLA | Southeast & Specialty | 0 | 0 | 0 | 0 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| B&H Athens | Northeast | 0 | 68,788 | 68,788 | 68,788 | $23.8M | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - NEW YORK | Northeast | 0 | 115 | 115 | 115 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - VANCOUVER | Canada | 0 | 39 | 39 | 39 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| Pittsburgh Maintenance | Corp Affairs | 0 | 2,358 | 2,358 | 2,358 | $209.0K | 0.0% |
|
Loading category breakdown...
|
|||||||
| West RDC | Northeast | 0 | 256,375 | 256,375 | 256,375 | $8.2M | 0.0% |
|
Loading category breakdown...
|
|||||||
| Technocraft | HQ HOB / Other | 0 | 1,126 | 1,126 | 1,126 | $104.7K | 0.0% |
|
Loading category breakdown...
|
|||||||
| Bil-Jax | HQ HOB / Other | 0 | 1,102 | 1,102 | 1,318 | $76.6K | 0.0% |
|
Loading category breakdown...
|
|||||||
| GREENWOOD STORAGE | West | 0 | 477 | 477 | 477 | $51.8K | 0.0% |
|
Loading category breakdown...
|
|||||||
| Safeworks, LLC (Spider)-60006-C&I | Northeast | 0 | 105 | 105 | 105 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - DETROIT | Northeast | 0 | 3 | 3 | 3 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - ORLANDO | Southeast & Specialty | 0 | 266 | 266 | 266 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| SPIDER - ST. LOUIS | Northeast | 0 | 37 | 37 | 37 | $0 | 0.0% |
|
Loading category breakdown...
|
|||||||
| Branch | Region | Category | In Yard | On Site | Total | Yard Value | Yard % |
|---|---|---|---|---|---|---|---|
| B&H Athens | Northeast | Construction Elevator | 56,536 | 0 | 56,536 | $22.3M | 100.0% |
|
Loading category breakdown...
|
|||||||
| SA Carlstad | Northeast | Construction Elevator | 283,191 | 164,043 | 447,234 | $14.8M | 63.3% |
|
Loading category breakdown...
|
|||||||
| Houston F&S | Gulf | Formwork Accessories | 556,539 | 28,390 | 584,982 | $8.9M | 95.1% |
|
Loading category breakdown...
|
|||||||
| Bridge New York | NA HQ | Scaffolding System | 135,394 | 2,170 | 137,909 | $7.5M | 98.2% |
|
Loading category breakdown...
|
|||||||
| Linden | Northeast | Grid and Decking | 106,633 | 8,204 | 115,270 | $6.9M | 92.5% |
|
Loading category breakdown...
|
|||||||
| Great Lakes CC | Northeast | Shoring System | 336,595 | 96,855 | 443,783 | $6.2M | 75.8% |
|
Loading category breakdown...
|
|||||||
| West RDC | Northeast | Scaffolding System | 181,323 | 0 | 181,323 | $5.5M | 100.0% |
|
Loading category breakdown...
|
|||||||
| Seattle F&S | West | Grid and Decking | 121,872 | 13,716 | 176,035 | $5.1M | 69.2% |
|
Loading category breakdown...
|
|||||||
| Sacramento Main | West | Grid and Decking | 84,820 | 1,296 | 111,174 | $5.0M | 76.3% |
|
Loading category breakdown...
|
|||||||
| Florida Fulfillment Center | Southeast & Specialty | Mast Climber | 5,030 | 0 | 5,056 | $4.9M | 99.5% |
|
Loading category breakdown...
|
|||||||
| Houston F&S | Gulf | Grid and Decking | 60,611 | 7,296 | 68,057 | $4.7M | 89.1% |
|
Loading category breakdown...
|
|||||||
| St.Louis RDC | NA HQ | Mast Climber | 2,343 | 0 | 2,343 | $4.7M | 100.0% |
|
Loading category breakdown...
|
|||||||
| Louisville Fulfillment Center | Southeast & Specialty | Suspended | 6,476 | 0 | 6,526 | $4.6M | 99.2% |
|
Loading category breakdown...
|
|||||||
| Wisconsin Rapids - Brace | Northeast | Scaffolding System | 101,438 | 41,465 | 142,903 | $4.5M | 71.0% |
|
Loading category breakdown...
|
|||||||
| Miami Fulfillment Center | Southeast & Specialty | Construction Elevator | 5,990 | 0 | 5,990 | $4.3M | 100.0% |
|
Loading category breakdown...
|
|||||||
| Great Lakes CC | Northeast | Grid and Decking | 51,129 | 992 | 52,121 | $4.1M | 98.1% |
|
Loading category breakdown...
|
|||||||
| SC TORONTO | Canada | SITE INFRASTRUCTURE & SAFETY | 52,159 | 1,079 | 53,238 | $4.0M | 98.0% |
|
Loading category breakdown...
|
|||||||
| Paraiso | FS LATAM | Scaffolding System | 138,196 | 37,336 | 175,532 | $4.0M | 78.7% |
|
Loading category breakdown...
|
|||||||
| NE RDC | Northeast | Construction Elevator | 30,450 | 0 | 30,450 | $3.9M | 100.0% |
|
Loading category breakdown...
|
|||||||
| TERREBONNE | Canada | Construction Elevator | 22,665 | 9,249 | 31,914 | $3.7M | 71.0% |
|
Loading category breakdown...
|
|||||||
| Engel Holdings - Union City | West | Construction Elevator | 10,189 | 5,166 | 15,368 | $3.6M | 66.3% |
|
Loading category breakdown...
|
|||||||
| Engel Holdings - Stanwood | West | Mast Climber | 1,735 | 0 | 1,735 | $3.5M | 100.0% |
|
Loading category breakdown...
|
|||||||
| SW Boston | Northeast | Suspended | 9,648 | 4,508 | 14,156 | $3.3M | 68.2% |
|
Loading category breakdown...
|
|||||||
| Great Lakes CC | Northeast | Climbing Formwork | 96,964 | 14,107 | 111,923 | $3.3M | 86.6% |
|
Loading category breakdown...
|
|||||||
| San Antonio Commercial | Gulf | Scaffolding System | 98,718 | 51,325 | 150,043 | $3.2M | 65.8% |
|
Loading category breakdown...
|
|||||||
| SC TORONTO | Canada | Mast Climber | 8,963 | 5,310 | 14,273 | $3.2M | 62.8% |
|
Loading category breakdown...
|
|||||||
| Carolina Commercial | Southeast & Specialty | Mast Climber | 6,251 | 0 | 6,264 | $3.0M | 99.8% |
|
Loading category breakdown...
|
|||||||
| SW SAN DIEGO | West | Construction Elevator | 14,459 | 1,727 | 16,186 | $2.9M | 89.3% |
|
Loading category breakdown...
|
|||||||
| SA Chicago | Northeast | Construction Elevator | 19,584 | 3,930 | 23,514 | $2.8M | 83.3% |
|
Loading category breakdown...
|
|||||||
| Edmonton F&S | Canada | Grid and Decking | 62,978 | 5,727 | 69,176 | $2.7M | 91.0% |
|
Loading category breakdown...
|
|||||||
| Item Description | Systems | Branches | Total Qty | Total Value | Min Cost | Max Cost | Cost Spread |
|---|---|---|---|---|---|---|---|
| ProfieldAGF | 3 | 7 | $1.2K | $0.01 | $403.10 | 4030900.0% | |
|
Loading branch breakdown...
|
|||||||
| ProfieldBAS | 59 | 44,611 | $1.9M | $0.01 | $49.30 | 492900.0% | |
|
Loading branch breakdown...
|
|||||||
| ProfieldBASAGF | 4 | 152 | $3.1K | $0.51 | $48.65 | 9520.3% | |
|
Loading branch breakdown...
|
|||||||
| BASAGF | 3 | 1,036 | $6.7K | $0.66 | $46.30 | 6933.3% | |
|
Loading branch breakdown...
|
|||||||
| ORACLEProfield | 6 | 4,103 | $4.7K | $0.60 | $36.25 | 5941.9% | |
|
Loading branch breakdown...
|
|||||||
| ProfieldBAS | 19 | 307 | $251.0K | $20.25 | $1221.60 | 5932.6% | |
|
Loading branch breakdown...
|
|||||||
| BASProfield | 3 | 19 | $1.5K | $6.41 | $200.00 | 3020.1% | |
|
Loading branch breakdown...
|
|||||||
| ProfieldBAS | 15 | 36,040 | $8.8K | $0.01 | $0.30 | 2900.0% | |
|
Loading branch breakdown...
|
|||||||
| BASProfieldORACLE | 64 | 9,700 | $1.2M | $127.37 | $2275.91 | 1686.9% | |
|
Loading branch breakdown...
|
|||||||
| ORACLEProfield | 11 | 12,614 | $174.9K | $13.94 | $237.12 | 1601.0% | |
|
Loading branch breakdown...
|
|||||||
| BASProfield | 32 | 519 | $43.9K | $6.78 | $105.60 | 1457.5% | |
|
Loading branch breakdown...
|
|||||||
| BASProfield | 75 | 40,116 | $1.9M | $4.11 | $61.80 | 1403.6% | |
|
Loading branch breakdown...
|
|||||||
| BASProfield | 47 | 1,424 | $229.8K | $12.94 | $192.20 | 1385.3% | |
|
Loading branch breakdown...
|
|||||||
| ProfieldBAS | 8 | 16 | $4.6K | $33.51 | $482.90 | 1341.1% | |
|
Loading branch breakdown...
|
|||||||
| BASProfieldORACLE | 13 | 7,353 | $84.6K | $11.55 | $156.31 | 1253.4% | |
|
Loading branch breakdown...
|
|||||||
| ProfieldBAS | 11 | 156 | $52.8K | $27.03 | $360.00 | 1231.9% | |
|
Loading branch breakdown...
|
|||||||
| ProfieldBAS | 42 | 2,241 | $31.4K | $1.81 | $23.10 | 1176.2% | |
|
Loading branch breakdown...
|
|||||||
| BASAGF | 3 | 37 | $7.2K | $32.83 | $405.80 | 1136.1% | |
|
Loading branch breakdown...
|
|||||||
| BASProfield | 14 | 297 | $92.3K | $32.63 | $392.00 | 1101.3% | |
|
Loading branch breakdown...
|
|||||||
| BASProfield | 21 | 140 | $39.8K | $25.38 | $300.00 | 1082.0% | |
|
Loading branch breakdown...
|
|||||||
| Item | Category | Regions | Min Rate | Max Rate | Avg Rate | Spread | Qty | Value |
|---|---|---|---|---|---|---|---|---|
| Suspended | $20.25 | $1221.60 | $789.43 | 5933% | 307 | $251.0K | ||
|
Loading regional breakdown...
|
||||||||
| Shoring System | $0.06 | $2.70 | $0.67 | 4400% | 291,239 | $40.3K | ||
|
Loading regional breakdown...
|
||||||||
| Universal | $0.01 | $0.30 | $0.20 | 2900% | 36,040 | $8.8K | ||
|
Loading regional breakdown...
|
||||||||
| Universal | $127.37 | $2275.91 | $153.29 | 1687% | 9,700 | $1.2M | ||
|
Loading regional breakdown...
|
||||||||
| Universal | $278.75 | $4684.52 | $469.88 | 1581% | 750 | $198.0K | ||
|
Loading regional breakdown...
|
||||||||
| Shoring System | $15.18 | $246.20 | $32.10 | 1522% | 11,550 | $165.6K | ||
|
Loading regional breakdown...
|
||||||||
| Universal | $209.51 | $3352.67 | $531.99 | 1500% | 130 | $26.1K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $6.78 | $105.60 | $79.70 | 1458% | 519 | $43.9K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $4.11 | $61.80 | $37.51 | 1404% | 40,116 | $1.9M | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $12.94 | $192.20 | $149.18 | 1385% | 1,424 | $229.8K | ||
|
Loading regional breakdown...
|
||||||||
| Shoring System | $14.92 | $215.48 | $33.68 | 1344% | 15,628 | $200.5K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $33.51 | $482.90 | $370.55 | 1341% | 16 | $4.6K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $27.03 | $360.00 | $299.46 | 1232% | 156 | $52.8K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $1.81 | $23.10 | $14.87 | 1176% | 2,241 | $31.4K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $32.63 | $392.00 | $263.65 | 1101% | 297 | $92.3K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $25.38 | $300.00 | $273.85 | 1082% | 140 | $39.8K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $0.99 | $10.78 | $8.23 | 989% | 5,867 | $53.7K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $3.93 | $41.60 | $24.86 | 959% | 138 | $3.2K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $3.75 | $37.50 | $25.36 | 900% | 1,092 | $29.9K | ||
|
Loading regional breakdown...
|
||||||||
| Suspended | $55.81 | $516.00 | $391.62 | 825% | 1,342 | $585.2K | ||
|
Loading regional breakdown...
|
||||||||
| Branch | Region | SKUs | Fleet Value | On Site | Rent Ready | Repair | Damaged | Utilization | Impaired | Assessment |
|---|---|---|---|---|---|---|---|---|---|---|
| Woodland LayDown | West | 46 | $74.4K | 0 | 6,641 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| USD Region Offices | NA HQ | 246 | $4.9M | 0 | 723,990 | 0 | 0 | 0.0% | 0.0% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| VANCOUVER ILS FGI | Canada | 2 | $11.5K | 0 | 226 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| DSS | HQ HOB / Other | 18 | $475.7K | 0 | 10,810 | 104 | 0 | 0.0% | 1.0% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| Virginia Fulfillment Center | Southeast & Specialty | 123 | $2.8M | 0 | 3,902 | 2 | 0 | 0.0% | 0.1% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| SPIDER - DALLAS | Gulf | 2 | $0 | 0 | 178 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| B&H Athens | Northeast | 210 | $23.8M | 0 | 68,788 | 0 | 0 | 0.0% | 0.0% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| Manitoba | Canada | 22 | $56.6K | 0 | 1,809 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| Bil-Jax | HQ HOB / Other | 23 | $76.6K | 0 | 1,102 | 216 | 0 | 0.0% | 16.4% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| Safeworks, LLC (Spider)-60008-C&I | Northeast | 16 | $0 | 0 | 488 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| Miami Fulfillment Center | Southeast & Specialty | 50 | $5.3M | 0 | 6,551 | 0 | 0 | 0.0% | 0.0% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| Louisville Fulfillment Center | Southeast & Specialty | 281 | $4.8M | 0 | 6,701 | 50 | 0 | 0.0% | 0.7% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| Carolina Commercial | Southeast & Specialty | 121 | $3.6M | 0 | 6,917 | 13 | 0 | 0.0% | 0.2% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| GREENWOOD STORAGE | West | 16 | $51.8K | 0 | 477 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| SPIDER - ORLANDO | Southeast & Specialty | 4 | $0 | 0 | 266 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| SPIDER - SEATTLE | West | 3 | $0 | 0 | 251 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| Saskatchewan | Canada | 21 | $17.5K | 0 | 267 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| SW SAN FRANCISCO | West | 2 | $2.4K | 0 | 130 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| Safeworks, LLC (Spider)-60013-E&I | Gulf | 2 | $0 | 0 | 175 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| West RDC | Northeast | 781 | $8.2M | 0 | 256,375 | 0 | 0 | 0.0% | 0.0% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| VANCOUVER FGI | Canada | 4 | $80.0K | 0 | 2,100 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| St.Louis RDC | NA HQ | 202 | $7.5M | 0 | 18,463 | 0 | 0 | 0.0% | 0.0% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| EI HQ N | Gulf | 284 | $3.0M | 0 | 74,367 | 0 | 0 | 0.0% | 0.0% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| Corporate Maintenance | CFO | 329 | $3.4M | 0 | 139,026 | 1,941 | 0 | 0.0% | 1.4% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| Houston Fulfillment Center | Southeast & Specialty | 5 | $32.6K | 0 | 937 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| SPIDER - NEW YORK | Northeast | 1 | $0 | 0 | 115 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
| Birmingham RDC | NA HQ | 549 | $4.7M | 0 | 123,492 | 0 | 0 | 0.0% | 0.0% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| Technocraft | HQ HOB / Other | 10 | $104.7K | 0 | 1,126 | 0 | 0 | 0.0% | 0.0% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| Jasper Materials | HQ HOB / Other | 104 | $376.7K | 0 | 44,642 | 1,338 | 0 | 0.0% | 2.9% | OVER-CAPITALIZED |
|
Loading category breakdown...
|
||||||||||
| Safeworks, LLC (Spider)-60006-C&I | Northeast | 4 | $0 | 0 | 105 | 0 | 0 | 0.0% | 0.0% | REVIEW NEEDED |
|
Loading category breakdown...
|
||||||||||
Repair Queue Blitz (Week 1-4) → Click for details
$55.5M trapped in repair ($49.9M) and damage ($5.6M) queues — 2.7% of total fleet.
Target: Reduce trapped capital by 40% ($5,528,456 → $5,528,456) within 30 days
Fleet Rebalancing Sprint (Week 2-6) → Click for details
69 branches operate below 20% utilization with $319.4M in surplus inventory. Meanwhile, 63 branches exceed 70% utilization and are capacity-constrained.
Target: Improve fleet utilization from 44.4% → 52% (+8pp) through $95.8M in strategic transfers
Rate Card Harmonization (Week 4-8) → Click for details
20 items worth $5.2M have >50% rate spread across regions — same equipment priced differently, creating margin leakage and customer confusion.
Target: Reduce rate spread from >50% to <20% on top 100 SKUs — capture estimated 5-8% margin improvement
System Consolidation Roadmap (Week 6-12) → Click for details
20 items worth $6.1M are tracked across multiple ERPs (Profield, BAS, AGF, ORACLE) with >20% cost variance — a hidden procurement tax.
Target: Single source of truth for top 200 SKUs — reduce procurement variance by 15%
Dead Capital Liquidation (Week 8-12) → Click for details
30 branch-category positions with >60% yard idle rate, totaling $161.2M in dead capital (7.9% of fleet).
Target: Redeploy or liquidate 30% of dead capital (61,220,499 × 0.30 = recovery target)