Business Pattern Analysis

Uncovering hidden capital inefficiencies, utilization imbalances, and transformation opportunities across the fleet

?
Total Fleet Value SUM(TotalQty$_PL_USD)
Total dollar value of all equipment across your fleet (on-site + yard + repair + damage). Source: yard_inventory table.
$2.0B
Total Fleet Value
14,864 SKUs • 198 branches • 11 regions
?
Overall Utilization SUM(QtyOnSite) / SUM(TotalQty) × 100
Percentage of total equipment actively deployed at customer sites vs sitting idle. Higher = better capital efficiency.
61.8%
Overall Utilization
69 branches <20% • 63 branches >70%
?
Trapped Capital Repair$ + Damage$
Where Repair$ = (QtyInRepair/TotalQty) × TotalValue and Damage$ = (QtyDamage/TotalQty) × TotalValue. This is capital locked in broken equipment generating zero revenue.
$55.5M
Trapped Capital
2.7% of fleet • Repair + Damage queues
?
Rebalancing Opportunity SUM(SurplusValue × 0.30)
For branches with <20% utilization, calculates surplus inventory value and takes 30% as conservative transfer estimate. Move equipment from surplus to high-demand locations.
$95.8M
Rebalancing Opportunity
Est. transferable value from surplus branches
?
Dead Capital SUM(YardValue) WHERE (QtyInYard/TotalQty) > 60%
Sum of inventory value for branch-category positions where more than 60% of equipment sits idle in yards. This is "dead" inventory not generating any revenue.
$161.2M
Dead Capital
30 positions with >60% idle in yards
Executive Summary — Key Findings & Opportunities
1. Fleet Utilization Gap: The $2.0B fleet operates at 61.8% average utilization. 69 branches (34.8%) operate below 20% utilization with $319.4M in surplus inventory, while 63 branches (31.8%) exceed 70% and are capacity-constrained.

2. Trapped Capital: $55.5M (2.7%) is locked in repair ($49.9M) and damage ($5.6M) queues — capital that generates zero revenue while accumulating holding costs.

3. Transfer Opportunity: Rebalancing inventory from surplus to constrained branches could unlock an estimated $95.8M in earning potential without new capex.

4. System Fragmentation: 20 items worth $6.1M are tracked across multiple ERPs with >20% cost variance — a hidden procurement tax.

5. Pricing Arbitrage: 20 items totaling $5.2M show >50% regional rate spreads — margin leakage requiring rate harmonization.
Trapped Capital
$55.5M
In Repair
$49.9M
Damaged
$5.6M
2.7% of total fleet value ($2.0B) is non-earning.
Top branches: Toronto F&S, Seattle F&S, Fontana
Click to drill down → Audit repair queues, set 30-day SLA
Fleet Rebalancing
$95.8M
Surplus Branches
69
34.8% of 198 branches
Constrained
63
31.8% of branches
$319.4M in surplus inventory at underutilized branches (<20% util). Avg utilization: 44.4%.
Top surplus: Great Lakes CC (16.4%), B&H Athens (0.0%), Toronto F&S (12.4%)
Click to drill down → Match surplus with constrained branches
System Fragmentation
$6.1M
Affected Items
20
>20% cost spread
Inventory Value
$6.1M
Items tracked across multiple ERPs with inconsistent pricing.
Top items: T7 TIRFOR (4030900% spread); GUARD RAIL GATE (492900% spread)
Click to drill down → Harmonize to lowest allocation cost
Regional Pricing Gap
$5.2M
Items Affected
20
>50% rate spread
Inventory at Risk
$5.2M
Same items priced differently across regions — margin leakage.
Top items: MOD PLATFORM 1/2M W/4 HB… (5933% spread); A CLAMP ASSEMBLY (4400% spread)
Click to drill down → Implement zone-based pricing
Capital at Vendors
$7.3M
% of Fleet
0.4%
Est. Monthly Loss
$7.3M
@5% monthly rate
Equipment at third-party vendors — invisible to dispatch, not earning revenue.
ACTION: Weekly vendor return SLA, prioritize high-value items
Dead Capital in Yards
$161.2M
Positions
30
branch-category combos
Units Idle
2.7M
>60% in yard
7.9% of total fleet sitting idle — candidates for transfer, resale, or write-off.
Top positions: B&H Athens / Construction E… ($22.3M); SA Carlstad / Construction E… ($14.8M)
Click to drill down → Set disposition plan for items idle >90 days
Regional Utilization Heatmap
Fleet avg: 61.8% | Target: >50% | Click region for branch breakdown
Gulf
70.5%
19 branches
West
67.0%
52 branches
Northeast
63.8%
46 branches
Southeast & Specialty
61.0%
36 branches
Canada
57.6%
31 branches
FS LATAM
43.7%
4 branches
NA HQ
0.2%
4 branches
CFO
0.0%
1 branches
HQ HOB / Other
0.0%
5 branches
NA
0.0%
0 branches
Corp Affairs
0.0%
1 branches
>60% (High) 45-60% 20-45% <20% (Low)
Source System Comparison
Click row for branch breakdown
SystemBranchesSKUsTotal QtyFleet ValueUtilizationImpaired %
Profield 75 8,949 61.4M $1.1B 59.4% 1.8%
Loading branch breakdown...
BAS 98 9,051 25.7M $895.6M 68.4% 0.2%
Loading branch breakdown...
AGF 5 644 333.9K $16.1M 3.4% 0.0%
Loading branch breakdown...
ORACLE 0 26 4.9K $103.0K 0.0% 0.0%
Loading branch breakdown...
JDE 25 54 2.0K $16.5K 0.1% 0.2%
Loading branch breakdown...
Category Portfolio Mix
Click row for branch breakdown
CategoryBranchesSKUsTotal QtyFleet ValueUtilizationRepair %Concentration
Scaffolding System 155 3,523 29.7M $791.8M 74.8% 0.1%
Loading branch breakdown...
Universal 166 2,212 27.4M $514.2M 81.7% 0.3%
Loading branch breakdown...
Construction Elevator 76 541 955.3K $143.4M 38.9% 0.0%
Loading branch breakdown...
Shoring System 140 908 7.8M $124.2M 46.8% 2.6%
Loading branch breakdown...
Suspended 153 2,396 635.5K $114.7M 47.2% 0.1%
Loading branch breakdown...
Formwork 80 1,742 4.3M $104.0M 53.0% 2.9%
Loading branch breakdown...
Grid and Decking 34 305 988.1K $59.7M 13.6% 16.1%
Loading branch breakdown...
Beam Formwork 135 372 1.2M $58.3M 40.6% 3.6%
Loading branch breakdown...
Mast Climber 82 606 99.8K $47.6M 24.0% 0.1%
Loading branch breakdown...
Formwork Accessories 142 1,089 13.8M $26.1M 14.9% 2.6%
Loading branch breakdown...
SITE INFRASTRUCTURE & SAFETY 74 81 148.4K $15.2M 26.0% 0.9%
Loading branch breakdown...
Material Hoist 102 143 39.4K $13.0M 51.5% 0.0%
Loading branch breakdown...
Transport Platform 78 202 22.7K $10.4M 20.2% 0.0%
Loading branch breakdown...
Climbing Formwork 17 353 260.5K $8.3M 35.1% 0.6%
Loading branch breakdown...
AWP Core 6 27 99.0 $2.5M 36.4% 0.0%
Loading branch breakdown...
Material Lifting 88 104 1.7K $1.8M 25.9% 0.1%
Loading branch breakdown...
Aerial Work Platforms – Legacy 9 18 2.5K $989.9K 68.3% 0.0%
Loading branch breakdown...
None 6 122 55.7K $959.8K 0.6% 0.0%
Loading branch breakdown...
AWP Repair Parts 33 59 53.2K $586.4K 22.9% 0.0%
Loading branch breakdown...
SHORING SYSTEM 0 13 3.0K $89.5K 0.0% 0.0%
Loading branch breakdown...
Capital trapped in repair and damage queues is the most immediate value-destruction pattern. Each day in repair is a day of lost rental revenue. The branches below have the highest absolute dollar value locked in non-earning states — these are the priority targets for repair SLA enforcement, write-off review, or vendor acceleration programs. Click any row to see category breakdown.
BranchRegionRepair QtyDamaged QtyRepair ValueDamage ValueTotal FleetTrapped %
Toronto F&S Canada 212,341 1,204 $13.6M $197.8K $45.6M 30.2%
Loading category breakdown...
Seattle F&S West 73,848 25,946 $5.8M $1.3M $14.3M 49.9%
Loading category breakdown...
Fontana West 92,829 8,383 $6.3M $662.9K $17.2M 40.3%
Loading category breakdown...
Great Lakes CC Northeast 316,067 5,331 $6.6M $309.4K $16.5M 41.6%
Loading category breakdown...
Sacramento Main West 35,555 4,884 $3.9M $482.5K $15.7M 28.0%
Loading category breakdown...
Vancouver F&S Canada 35,804 47,432 $1.9M $762.7K $16.2M 16.8%
Loading category breakdown...
Houston F&S Gulf 30,654 3,341 $2.0M $395.9K $27.0M 8.8%
Loading category breakdown...
Edmonton F&S Canada 26,453 21,321 $1.8M $553.7K $21.8M 10.8%
Loading category breakdown...
Miami Southeast & Specialty 44,460 0 $2.0M $0 $11.1M 18.1%
Loading category breakdown...
Engel Holdings - Stanwood West 11 0 $1.4M $0 $2.0M 68.8%
Loading category breakdown...
Engel Holdings - Fontana West 33 0 $911.7K $0 $3.4M 26.5%
Loading category breakdown...
Edmonton Canada 30,478 2 $766.2K $37 $9.6M 8.0%
Loading category breakdown...
SW Boston Northeast 135 0 $765.5K $0 $806.4K 94.9%
Loading category breakdown...
Fort McMurray Canada 21,453 7,019 $410.6K $102.1K $49.5M 1.0%
Loading category breakdown...
Montreal F&S Canada 30,943 1,816 $280.8K $220.2K $2.4M 20.7%
Loading category breakdown...
Linden Northeast 1,885 3,286 $103.9K $115.7K $11.1M 2.0%
Loading category breakdown...
Atlanta F&S Southeast & Specialty 3,857 1,117 $201.7K $16.6K $5.0M 4.4%
Loading category breakdown...
Charlotte Southeast & Specialty 203 0 $205.6K $0 $865.1K 23.8%
Loading category breakdown...
Huntington Northeast 6,907 644 $179.7K $19.9K $219.0K 91.1%
Loading category breakdown...
Cincinnati Southeast & Specialty 4 0 $159.8K $0 $1.4M 11.2%
Loading category breakdown...
Utilization imbalance reveals the fleet allocation problem: some branches sit on surplus equipment earning nothing, while others turn away business because they lack inventory. The table is sorted lowest-utilization-first — these are the branches where capital is most idle and transfers would have the highest impact. Click any row to see category breakdown.
BranchRegionOn SiteRent ReadyIn YardTotal QtyFleet ValueUtilization
DSS HQ HOB / Other 0 10,810 10,810 10,914 $475.7K 0.0%
Loading category breakdown...
Safeworks, LLC (Spider)-60026-E&I West 0 37 37 37 $0 0.0%
Loading category breakdown...
SW SAN FRANCISCO West 0 130 130 130 $2.4K 0.0%
Loading category breakdown...
Corporate Maintenance CFO 0 139,026 139,026 140,967 $3.4M 0.0%
Loading category breakdown...
R&D HQ HOB / Other 0 52 52 52 $1.8K 0.0%
Loading category breakdown...
Safeworks, LLC (Spider)-60008-C&I Northeast 0 488 488 488 $0 0.0%
Loading category breakdown...
St.Louis RDC NA HQ 0 18,463 18,463 18,463 $7.5M 0.0%
Loading category breakdown...
Louisville Fulfillment Center Southeast & Specialty 0 6,701 6,701 6,751 $4.8M 0.0%
Loading category breakdown...
SPIDER - NEW ORLEANS Gulf 0 2 2 2 $0 0.0%
Loading category breakdown...
USD Region Offices NA HQ 0 723,990 723,990 723,990 $4.9M 0.0%
Loading category breakdown...
SPIDER - ELEVATOR Southeast & Specialty 0 1 1 1 $0 0.0%
Loading category breakdown...
SW St Louis Northeast 0 75 75 75 $0 0.0%
Loading category breakdown...
SPIDER - DALLAS Gulf 0 178 178 178 $0 0.0%
Loading category breakdown...
Jasper Materials HQ HOB / Other 0 44,642 44,642 45,980 $376.7K 0.0%
Loading category breakdown...
SPIDER - CHARLOTTE Southeast & Specialty 0 10 10 14 $10.9K 0.0%
Loading category breakdown...
Carolina Commercial Southeast & Specialty 0 6,917 6,917 6,930 $3.6M 0.0%
Loading category breakdown...
Saskatchewan Canada 0 267 267 267 $17.5K 0.0%
Loading category breakdown...
SPIDER - PENSACOLA Southeast & Specialty 0 0 0 0 $0 0.0%
Loading category breakdown...
B&H Athens Northeast 0 68,788 68,788 68,788 $23.8M 0.0%
Loading category breakdown...
SPIDER - NEW YORK Northeast 0 115 115 115 $0 0.0%
Loading category breakdown...
SPIDER - VANCOUVER Canada 0 39 39 39 $0 0.0%
Loading category breakdown...
Pittsburgh Maintenance Corp Affairs 0 2,358 2,358 2,358 $209.0K 0.0%
Loading category breakdown...
West RDC Northeast 0 256,375 256,375 256,375 $8.2M 0.0%
Loading category breakdown...
Technocraft HQ HOB / Other 0 1,126 1,126 1,126 $104.7K 0.0%
Loading category breakdown...
Bil-Jax HQ HOB / Other 0 1,102 1,102 1,318 $76.6K 0.0%
Loading category breakdown...
GREENWOOD STORAGE West 0 477 477 477 $51.8K 0.0%
Loading category breakdown...
Safeworks, LLC (Spider)-60006-C&I Northeast 0 105 105 105 $0 0.0%
Loading category breakdown...
SPIDER - DETROIT Northeast 0 3 3 3 $0 0.0%
Loading category breakdown...
SPIDER - ORLANDO Southeast & Specialty 0 266 266 266 $0 0.0%
Loading category breakdown...
SPIDER - ST. LOUIS Northeast 0 37 37 37 $0 0.0%
Loading category breakdown...
These branch-category positions have more than 60% of inventory sitting idle in yards. Unlike "rent ready" equipment awaiting dispatch, these items are occupying yard space, accumulating depreciation, and generating zero return. Each row is a candidate for inter-branch rebalancing, resale, or strategic write-off.
BranchRegionCategoryIn YardOn SiteTotalYard ValueYard %
B&H Athens Northeast Construction Elevator 56,536 0 56,536 $22.3M 100.0%
Loading category breakdown...
SA Carlstad Northeast Construction Elevator 283,191 164,043 447,234 $14.8M 63.3%
Loading category breakdown...
Houston F&S Gulf Formwork Accessories 556,539 28,390 584,982 $8.9M 95.1%
Loading category breakdown...
Bridge New York NA HQ Scaffolding System 135,394 2,170 137,909 $7.5M 98.2%
Loading category breakdown...
Linden Northeast Grid and Decking 106,633 8,204 115,270 $6.9M 92.5%
Loading category breakdown...
Great Lakes CC Northeast Shoring System 336,595 96,855 443,783 $6.2M 75.8%
Loading category breakdown...
West RDC Northeast Scaffolding System 181,323 0 181,323 $5.5M 100.0%
Loading category breakdown...
Seattle F&S West Grid and Decking 121,872 13,716 176,035 $5.1M 69.2%
Loading category breakdown...
Sacramento Main West Grid and Decking 84,820 1,296 111,174 $5.0M 76.3%
Loading category breakdown...
Florida Fulfillment Center Southeast & Specialty Mast Climber 5,030 0 5,056 $4.9M 99.5%
Loading category breakdown...
Houston F&S Gulf Grid and Decking 60,611 7,296 68,057 $4.7M 89.1%
Loading category breakdown...
St.Louis RDC NA HQ Mast Climber 2,343 0 2,343 $4.7M 100.0%
Loading category breakdown...
Louisville Fulfillment Center Southeast & Specialty Suspended 6,476 0 6,526 $4.6M 99.2%
Loading category breakdown...
Wisconsin Rapids - Brace Northeast Scaffolding System 101,438 41,465 142,903 $4.5M 71.0%
Loading category breakdown...
Miami Fulfillment Center Southeast & Specialty Construction Elevator 5,990 0 5,990 $4.3M 100.0%
Loading category breakdown...
Great Lakes CC Northeast Grid and Decking 51,129 992 52,121 $4.1M 98.1%
Loading category breakdown...
SC TORONTO Canada SITE INFRASTRUCTURE & SAFETY 52,159 1,079 53,238 $4.0M 98.0%
Loading category breakdown...
Paraiso FS LATAM Scaffolding System 138,196 37,336 175,532 $4.0M 78.7%
Loading category breakdown...
NE RDC Northeast Construction Elevator 30,450 0 30,450 $3.9M 100.0%
Loading category breakdown...
TERREBONNE Canada Construction Elevator 22,665 9,249 31,914 $3.7M 71.0%
Loading category breakdown...
Engel Holdings - Union City West Construction Elevator 10,189 5,166 15,368 $3.6M 66.3%
Loading category breakdown...
Engel Holdings - Stanwood West Mast Climber 1,735 0 1,735 $3.5M 100.0%
Loading category breakdown...
SW Boston Northeast Suspended 9,648 4,508 14,156 $3.3M 68.2%
Loading category breakdown...
Great Lakes CC Northeast Climbing Formwork 96,964 14,107 111,923 $3.3M 86.6%
Loading category breakdown...
San Antonio Commercial Gulf Scaffolding System 98,718 51,325 150,043 $3.2M 65.8%
Loading category breakdown...
SC TORONTO Canada Mast Climber 8,963 5,310 14,273 $3.2M 62.8%
Loading category breakdown...
Carolina Commercial Southeast & Specialty Mast Climber 6,251 0 6,264 $3.0M 99.8%
Loading category breakdown...
SW SAN DIEGO West Construction Elevator 14,459 1,727 16,186 $2.9M 89.3%
Loading category breakdown...
SA Chicago Northeast Construction Elevator 19,584 3,930 23,514 $2.8M 83.3%
Loading category breakdown...
Edmonton F&S Canada Grid and Decking 62,978 5,727 69,176 $2.7M 91.0%
Loading category breakdown...
When the same equipment is tracked in multiple ERP systems with different item codes and costs, it creates a hidden tax: inflated procurement costs, inconsistent pricing to customers, and inventory planning blind spots. The cost spread column shows the percentage difference between the cheapest and most expensive allocation cost for the same item across systems. Click any row to see branch-by-branch breakdown.
Item DescriptionSystemsBranchesTotal QtyTotal ValueMin CostMax CostCost Spread
T7 TIRFOR ProfieldAGF 3 7 $1.2K $0.01 $403.10 4030900.0%
Loading branch breakdown...
GUARD RAIL GATE ProfieldBAS 59 44,611 $1.9M $0.01 $49.30 492900.0%
Loading branch breakdown...
WP SLIDING TUBE M2 ProfieldBASAGF 4 152 $3.1K $0.51 $48.65 9520.3%
Loading branch breakdown...
PIGTAIL BASAGF 3 1,036 $6.7K $0.66 $46.30 6933.3%
Loading branch breakdown...
J CLAMP ASSEMBLY ORACLEProfield 6 4,103 $4.7K $0.60 $36.25 5941.9%
Loading branch breakdown...
MOD PLATFORM 1/2M W/4 HBRKTS ProfieldBAS 19 307 $251.0K $20.25 $1221.60 5932.6%
Loading branch breakdown...
PSC BUILDING ROLLER W BASProfield 3 19 $1.5K $6.41 $200.00 3020.1%
Loading branch breakdown...
BLOCKING 2" X 10" X 18 ProfieldBAS 15 36,040 $8.8K $0.01 $0.30 2900.0%
Loading branch breakdown...
STACK RACK BASProfieldORACLE 64 9,700 $1.2M $127.37 $2275.91 1686.9%
Loading branch breakdown...
FRAME ALUMA DIAGONAL STD 79.29 ORACLEProfield 11 12,614 $174.9K $13.94 $237.12 1601.0%
Loading branch breakdown...
PSC OUTRIGGER BEAM CWT HNGR BASProfield 32 519 $43.9K $6.78 $105.60 1457.5%
Loading branch breakdown...
PSC COUNTER WEIGHT BASProfield 75 40,116 $1.9M $4.11 $61.80 1403.6%
Loading branch breakdown...
PSC OUTRIGGER BEAM FR BASProfield 47 1,424 $229.8K $12.94 $192.20 1385.3%
Loading branch breakdown...
PSC BOSUN CHAIR ProfieldBAS 8 16 $4.6K $33.51 $482.90 1341.1%
Loading branch breakdown...
BRACE 3FT 4FT X 8FT BASProfieldORACLE 13 7,353 $84.6K $11.55 $156.31 1253.4%
Loading branch breakdown...
PSC ROOF HOOK 24" ProfieldBAS 11 156 $52.8K $27.03 $360.00 1231.9%
Loading branch breakdown...
PSC STAGE GUARD R POST ProfieldBAS 42 2,241 $31.4K $1.81 $23.10 1176.2%
Loading branch breakdown...
40' EXTENSION LADDER BASAGF 3 37 $7.2K $32.83 $405.80 1136.1%
Loading branch breakdown...
PSC STIRRUP W/CASTERS BASProfield 14 297 $92.3K $32.63 $392.00 1101.3%
Loading branch breakdown...
PSC PARAPET CLAMP STL BASProfield 21 140 $39.8K $25.38 $300.00 1082.0%
Loading branch breakdown...
These items have PL rates that differ by more than 50% across regions. This means the same piece of equipment earns vastly different rental revenue depending on where it's deployed. While some regional variation is expected (market rates differ), spreads over 100% suggest rate card misalignment rather than genuine market pricing — and a margin leak when customers compare quotes. Click any row to see regional rate breakdown.
ItemCategoryRegionsMin RateMax RateAvg RateSpreadQtyValue
MOD PLATFORM 1/2M W/4 HBRKTS Suspended Southeast & Specialty,Northeast,Canada,West $20.25 $1221.60 $789.43 5933% 307 $251.0K
Loading regional breakdown...
A CLAMP ASSEMBLY Shoring System Canada,Northeast,West,Gulf,Southeast & Specialty,FS LATAM $0.06 $2.70 $0.67 4400% 291,239 $40.3K
Loading regional breakdown...
BLOCKING 2" X 10" X 18 Universal Southeast & Specialty,West,Northeast $0.01 $0.30 $0.20 2900% 36,040 $8.8K
Loading regional breakdown...
STACK RACK Universal Northeast,NA HQ,FS LATAM,Canada,Gulf,Southeast & Specialty,West,NA,CFO $127.37 $2275.91 $153.29 1687% 9,700 $1.2M
Loading regional breakdown...
Euro Lattice Box Universal Canada,FS LATAM,NA HQ,Northeast,West,NA,Southeast & Specialty,Gulf $278.75 $4684.52 $469.88 1581% 750 $198.0K
Loading regional breakdown...
CROSS BRACE 45"X8' (5X8)-BROWN Shoring System West,Gulf,Canada,FS LATAM,Northeast,NA $15.18 $246.20 $32.10 1522% 11,550 $165.6K
Loading regional breakdown...
Euro Stacking Frame 120/80 Universal FS LATAM,Canada,NA,West,Southeast & Specialty,Northeast $209.51 $3352.67 $531.99 1500% 130 $26.1K
Loading regional breakdown...
PSC OUTRIGGER BEAM CWT HNGR Suspended Canada,Southeast & Specialty,West,Northeast $6.78 $105.60 $79.70 1458% 519 $43.9K
Loading regional breakdown...
PSC COUNTER WEIGHT Suspended Northeast,NA HQ,Southeast & Specialty,Gulf,West,Canada $4.11 $61.80 $37.51 1404% 40,116 $1.9M
Loading regional breakdown...
PSC OUTRIGGER BEAM FR Suspended Southeast & Specialty,West,Northeast,NA HQ,Gulf $12.94 $192.20 $149.18 1385% 1,424 $229.8K
Loading regional breakdown...
CROSS BRACE 45"X7' (5X7)-SILVE Shoring System Gulf,NA,Northeast,Canada,West $14.92 $215.48 $33.68 1344% 15,628 $200.5K
Loading regional breakdown...
PSC BOSUN CHAIR Suspended Gulf,West,Northeast,Southeast & Specialty $33.51 $482.90 $370.55 1341% 16 $4.6K
Loading regional breakdown...
PSC ROOF HOOK 24" Suspended West,Northeast,NA HQ,Southeast & Specialty $27.03 $360.00 $299.46 1232% 156 $52.8K
Loading regional breakdown...
PSC STAGE GUARD R POST Suspended Gulf,Southeast & Specialty,NA HQ,Northeast,West $1.81 $23.10 $14.87 1176% 2,241 $31.4K
Loading regional breakdown...
PSC STIRRUP W/CASTERS Suspended Southeast & Specialty,West,Northeast,NA HQ $32.63 $392.00 $263.65 1101% 297 $92.3K
Loading regional breakdown...
PSC PARAPET CLAMP STL Suspended Northeast,West,Southeast & Specialty $25.38 $300.00 $273.85 1082% 140 $39.8K
Loading regional breakdown...
PS 32 MOUNTING PIN W/HAIR PIN Suspended Canada,Northeast,West,Southeast & Specialty $0.99 $10.78 $8.23 989% 5,867 $53.7K
Loading regional breakdown...
PSC ATH FILTER MOUNTING BRKT Suspended Northeast,West,Southeast & Specialty $3.93 $41.60 $24.86 959% 138 $3.2K
Loading regional breakdown...
CROSS BRACE 12' X 3' Suspended Canada,Southeast & Specialty,Gulf,West,Northeast $3.75 $37.50 $25.36 900% 1,092 $29.9K
Loading regional breakdown...
PSC OUTRIGGER BEAM ALUM 2 PCS Suspended NA HQ,Northeast,West,Southeast & Specialty,Gulf $55.81 $516.00 $391.62 825% 1,342 $585.2K
Loading regional breakdown...
Fleet right-sizing compares each branch's fleet size against its utilization and impairment rate. Branches with high fleet value but low utilization are over-capitalized — they hold more equipment than their market demands. Branches with high utilization and high impairment are under-serviced — their equipment is wearing out faster than it's being repaired or replaced.
BranchRegionSKUsFleet ValueOn SiteRent ReadyRepairDamagedUtilizationImpairedAssessment
Woodland LayDown West 46 $74.4K 0 6,641 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
USD Region Offices NA HQ 246 $4.9M 0 723,990 0 0 0.0% 0.0% OVER-CAPITALIZED
Loading category breakdown...
VANCOUVER ILS FGI Canada 2 $11.5K 0 226 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
DSS HQ HOB / Other 18 $475.7K 0 10,810 104 0 0.0% 1.0% OVER-CAPITALIZED
Loading category breakdown...
Virginia Fulfillment Center Southeast & Specialty 123 $2.8M 0 3,902 2 0 0.0% 0.1% OVER-CAPITALIZED
Loading category breakdown...
SPIDER - DALLAS Gulf 2 $0 0 178 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
B&H Athens Northeast 210 $23.8M 0 68,788 0 0 0.0% 0.0% OVER-CAPITALIZED
Loading category breakdown...
Manitoba Canada 22 $56.6K 0 1,809 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
Bil-Jax HQ HOB / Other 23 $76.6K 0 1,102 216 0 0.0% 16.4% REVIEW NEEDED
Loading category breakdown...
Safeworks, LLC (Spider)-60008-C&I Northeast 16 $0 0 488 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
Miami Fulfillment Center Southeast & Specialty 50 $5.3M 0 6,551 0 0 0.0% 0.0% OVER-CAPITALIZED
Loading category breakdown...
Louisville Fulfillment Center Southeast & Specialty 281 $4.8M 0 6,701 50 0 0.0% 0.7% OVER-CAPITALIZED
Loading category breakdown...
Carolina Commercial Southeast & Specialty 121 $3.6M 0 6,917 13 0 0.0% 0.2% OVER-CAPITALIZED
Loading category breakdown...
GREENWOOD STORAGE West 16 $51.8K 0 477 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
SPIDER - ORLANDO Southeast & Specialty 4 $0 0 266 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
SPIDER - SEATTLE West 3 $0 0 251 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
Saskatchewan Canada 21 $17.5K 0 267 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
SW SAN FRANCISCO West 2 $2.4K 0 130 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
Safeworks, LLC (Spider)-60013-E&I Gulf 2 $0 0 175 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
West RDC Northeast 781 $8.2M 0 256,375 0 0 0.0% 0.0% OVER-CAPITALIZED
Loading category breakdown...
VANCOUVER FGI Canada 4 $80.0K 0 2,100 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
St.Louis RDC NA HQ 202 $7.5M 0 18,463 0 0 0.0% 0.0% OVER-CAPITALIZED
Loading category breakdown...
EI HQ N Gulf 284 $3.0M 0 74,367 0 0 0.0% 0.0% OVER-CAPITALIZED
Loading category breakdown...
Corporate Maintenance CFO 329 $3.4M 0 139,026 1,941 0 0.0% 1.4% OVER-CAPITALIZED
Loading category breakdown...
Houston Fulfillment Center Southeast & Specialty 5 $32.6K 0 937 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
SPIDER - NEW YORK Northeast 1 $0 0 115 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
Birmingham RDC NA HQ 549 $4.7M 0 123,492 0 0 0.0% 0.0% OVER-CAPITALIZED
Loading category breakdown...
Technocraft HQ HOB / Other 10 $104.7K 0 1,126 0 0 0.0% 0.0% OVER-CAPITALIZED
Loading category breakdown...
Jasper Materials HQ HOB / Other 104 $376.7K 0 44,642 1,338 0 0.0% 2.9% OVER-CAPITALIZED
Loading category breakdown...
Safeworks, LLC (Spider)-60006-C&I Northeast 4 $0 0 105 0 0 0.0% 0.0% REVIEW NEEDED
Loading category breakdown...
This 90-day action plan targets $55.5M in trapped capital, $95.8M in rebalancing opportunity, and $161.2M in dead capital across 198 branches. Each initiative has specific branch targets, financial impact, and measurable KPIs.
Capital Efficiency Transformation — 90-Day Action Plan
1

Repair Queue Blitz (Week 1-4) → Click for details

$55.5M trapped in repair ($49.9M) and damage ($5.6M) queues — 2.7% of total fleet.

Priority Branches (Top 5)
Toronto F&S $13.6M repair + $197.8K damage
Seattle F&S $5.8M repair + $1.3M damage
Fontana $6.3M repair + $662.9K damage
Great Lakes CC $6.6M repair + $309.4K damage
Sacramento Main $3.9M repair + $482.5K damage
Actions: (1) Audit items in repair >60 days — evaluate write-off vs. repair economics (2) Set 30-day repair SLA with vendor penalty clauses (3) Expedite high-value items (>$5K unit cost) to front of queue
Target: Reduce trapped capital by 40% ($5,528,456 → $5,528,456) within 30 days
$55.5M
2

Fleet Rebalancing Sprint (Week 2-6) → Click for details

69 branches operate below 20% utilization with $319.4M in surplus inventory. Meanwhile, 63 branches exceed 70% utilization and are capacity-constrained.

Transfer FROM (Surplus)
Great Lakes CC (16.4% util)
B&H Athens (0.0% util)
Toronto F&S (12.4% util)
Transfer TO (Constrained)
Auburn (100.0% util)
CLAC (99.9% util)
Pascagoula (99.9% util)
Actions: (1) Match surplus branches with constrained branches by category (2) Prioritize Scaffolding System, Universal, Shoring — highest demand categories (3) Execute transfers for items with >$1K unit value and >30 days idle
Target: Improve fleet utilization from 44.4% → 52% (+8pp) through $95.8M in strategic transfers
$95.8M
3

Rate Card Harmonization (Week 4-8) → Click for details

20 items worth $5.2M have >50% rate spread across regions — same equipment priced differently, creating margin leakage and customer confusion.

Highest Spread Items
MOD PLATFORM 1/2M W/4 HBRKTS 5933% spread
A CLAMP ASSEMBLY 4400% spread
BLOCKING 2" X 10" X 18 2900% spread
Actions: (1) Audit rate cards for top 25 items by spread % (2) Implement 4-zone pricing: Metro, Urban, Rural, Remote (3) Set floor rates at 80% of highest-performing region
Target: Reduce rate spread from >50% to <20% on top 100 SKUs — capture estimated 5-8% margin improvement
$5.2M
4

System Consolidation Roadmap (Week 6-12) → Click for details

20 items worth $6.1M are tracked across multiple ERPs (Profield, BAS, AGF, ORACLE) with >20% cost variance — a hidden procurement tax.

Highest Cost Variance Items
T7 TIRFOR 4030900% cost spread
GUARD RAIL GATE 492900% cost spread
WP SLIDING TUBE M2 9520% cost spread
Actions: (1) Designate system of record per category (Profield for scaffolding, BAS for formwork) (2) Standardize allocation costs to lowest-cost source (3) Build unified inventory dashboard across ERPs
Target: Single source of truth for top 200 SKUs — reduce procurement variance by 15%
$6.1M
5

Dead Capital Liquidation (Week 8-12) → Click for details

30 branch-category positions with >60% yard idle rate, totaling $161.2M in dead capital (7.9% of fleet).

Highest Dead Capital Positions
B&H Athens / Construction Elevat… $22.3M idle
SA Carlstad / Construction Elevat… $14.8M idle
Houston F&S / Formwork Accessories $8.9M idle
Actions: (1) Physical audit of items idle >90 days (2) Triage: transfer to high-demand branch, list for resale, or write-off (3) Set quarterly fleet review cadence with branch managers
Target: Redeploy or liquidate 30% of dead capital (61,220,499 × 0.30 = recovery target)
$161.2M
90-Day Financial Impact Summary
Trapped Capital Recovery
$55.5M
40% target = 5528456 recovery
Rebalancing Value
$95.8M
From 69 surplus branches
Dead Capital Liquidation
$161.2M
30% target from 30 positions
Total Non-Earning
$62.8M
3.1% of $2.0B fleet
Bottom Line: Conservative 25% recovery across all levers represents significant working capital freed for redeployment. Improving fleet utilization from 44.4% to 70%+ target would increase revenue capacity by $95.8M without new capex. KPIs to track: Trapped capital ratio (target <5%), Fleet utilization (target >65%), Dead capital positions (target <10).