| Project Crystal Land AI Hub | Phoenix | AZ | — | Pre-Design | $1.0T | 2026-07-20 | 2029-02-16 |
| Ashwaubenon Street Culvert Replacement | Ashwaubenon | WI | — | General Contractor Award | $312.0B | 2026-04-09 | 2026-08-30 |
| Project Jupiter/Stargate | Santa Teresa | NM | — | General Contractor Award | $165.0B | 2026-03-02 | 2027-12-31 |
| SMS: Snow Removal Services | Allentown | PA | — | General Contractor Award | $114.5B | — | — |
| Bay D'Espoir Generating Station Major Projec… | Head Bay d'Espoir | NF | — | Pre-Design | $108.0B | 2028-04-03 | 2030-11-30 |
| Agincourt Mall Redevelopment (Blocks 1 throu… | Scarborough | ON | — | Schematic Design | $107.0B | 2028-06-15 | 2031-06-17 |
| Project Kestrel | Kansas City | MO | — | Design Development | $100.0B | 2026-07-27 | 2028-09-08 |
| North Beach Town Center (North Shore D) | Miami Beach | FL | — | Schematic Design | $80.0B | 2028-02-01 | 2030-04-28 |
| Stack Infrastructure Southern Virginia Megas… | Danville | VA | — | Pre-Design | $73.0B | 2026-09-01 | 2028-10-14 |
| RFQ D/B - I-81 CIP Ironto Widening Segment | Salem | TN | — | Construction Documents | $70.0B | 2025-10-06 | 2026-07-24 |
| Wind West Energy Project | Macphees Corner | NS | — | Pre-Design | $60.0B | 2030-11-01 | 2033-12-31 |
| Cambridge Square North Apartments | Indianapolis | IN | — | Construction Documents | $47.8B | 2026-06-01 | 2026-12-01 |
| Alaska LNG Pipeline Project Phases 1&2 | Nikiski | AK | — | Pre-Design | $44.0B | 2026-03-02 | 2028-08-23 |
| Alaska Natural Gas Pipeline | Nikiski | AK | CIVIL | Design Development | $43.4B | 2025-03-03 | 2026-08-25 |
| Peace River Nuclear Power Project - Energy A… | Peace River | AB | — | Schematic Design | $40.0B | 2028-10-16 | 2031-06-14 |
| Natrium Advanced Nuclear Plant | Bellevue | WA | — | Pre-Design | $40.0B | 2031-01-01 | 2033-08-29 |
| SMS: Advanced Contracting Initiative - Regio… | Rock Island | IL | — | Post Bid | $37.0B | 2026-04-24 | 2028-12-22 |
| Intel Semiconductor Manufacturing Complex Mo… | Hillsboro | OR | — | Pre-Design | $36.0B | 2026-12-31 | 2029-07-30 |
| Ike Dike - US Army Corps of Engineers | Galveston | TX | — | Pre-Design | $34.0B | 2030-01-04 | 2031-12-30 |
| La Osa Project | Florence | AZ | — | Pre-Design | $33.0B | 2027-02-01 | 2029-03-16 |
| Pinal County Data Center - La Osa Project | Eloy | AZ | — | Pre-Design | $33.0B | 2026-08-03 | 2028-09-15 |
| Virgin Hyperloop One | Miami | FL | CIVIL | Pre-Design | $31.1B | 2026-10-05 | 2030-03-20 |
| YZD - Mixed-Use Development | Toronto | ON | — | Schematic Design | $30.0B | 2028-07-17 | 2031-07-19 |
| Intel Silicon Heartland Chip Factory Develop… | New Albany | OH | — | General Contractor Award | $28.0B | 2027-12-17 | 2030-07-16 |
| Micron Technology at White Pine Commerce Cen… | Clay | NY | — | Construction Documents | $25.0B | 2026-06-08 | 2030-08-05 |
| Micron Technology at White Pine Commerce Cen… | Clay | NY | — | Construction Documents | $25.0B | 2030-11-11 | 2033-10-07 |
| Micron Technology at White Pine Commerce Cen… | Clay | NY | — | Construction Documents | $25.0B | 2035-08-20 | 2041-11-01 |
| Micron Technology at White Pine Commerce Cen… | Clay | NY | — | Construction Documents | $25.0B | 2035-08-27 | 2037-07-03 |
| Vantage Data Center Frontier Development Fut… | Albany | TX | — | Pre-Design | $25.0B | 2026-08-18 | 2029-12-31 |
| Hassayampa Ranch Data Center | Phoenix | AZ | — | Pre-Design | $25.0B | 2026-08-03 | 2028-09-15 |
| Taiwan Semiconductor Manufacturing Company -… | Phoenix | AZ | — | Construction Underway | $25.0B | 2025-05-01 | 2029-12-04 |
| LNG Canada Expansion - Phase 2 - Kitimat | Kitimat | BC | — | Schematic Design | $25.0B | 2027-02-01 | 2029-09-29 |
| Nextgeneration NYCHA Permanent Affordability… | Brooklyn | NY | — | Pre-Design | $24.0B | 2027-02-01 | 2030-02-02 |
| Samsung Austin Semiconductor Wafer Fabricati… | Taylor | TX | — | Pre-Design | $23.0B | 2029-01-01 | 2031-08-01 |
| Edmonton - Calgary TransPod Project | Calgary | AB | — | Design Development | $22.5B | 2028-11-15 | 2032-04-30 |
| Midwest Transmission Expansion Package - MISO | Fargo | ND | — | Pre-Design | $22.0B | 2026-09-16 | 2029-05-14 |
| Samsung Austin Semiconductor Wafer Fabricati… | Taylor | TX | — | Pre-Design | $21.5B | 2029-01-01 | 2031-08-01 |
| OPG Small Modular Reactor Project (SMR) at D… | Bowmanville | ON | — | General Contractor Award | $20.9B | 2025-10-01 | 2030-08-31 |
| Samsung Austin Semiconductor Wafer Fabricati… | Taylor | TX | — | Pre-Design | $20.5B | 2029-01-01 | 2031-08-01 |
| Travis County Terafab Semiconductor Manufact… | Austin | TX | — | Pre-Design | $20.0B | 2027-03-01 | 2029-09-28 |
| Intel Corp / Johnstown Gateway Planned Distr… | Johnstown | OH | — | Design Development | $20.0B | 2026-04-13 | 2027-12-31 |
| Turkey Point Complex Nuclear Reactors - Flor… | Homestead | FL | CIVIL | Pre-Design | $20.0B | 2025-09-08 | 2027-07-28 |
| One Central Project | Chicago | IL | RESIDENTIAL | Schematic Design | $20.0B | 2024-01-29 | 2030-11-04 |
| MACROHARDRR Data Center - xAI | Southaven | MS | — | Construction Documents | $20.0B | 2026-05-04 | 2028-06-16 |
| Louisiana Liquefied Natural Gas (LNG) Produc… | Sulphur | LA | — | Design Development | $20.0B | 2030-01-07 | 2032-09-04 |
| Samsung Austin Semiconductor Wafer Fabricati… | Taylor | TX | — | Pre-Design | $19.5B | 2029-01-01 | 2031-08-01 |
| Samsung Austin Semiconductor Wafer Fabricati… | Taylor | TX | — | Pre-Design | $18.5B | 2029-01-01 | 2031-08-01 |
| Texas Central Railway High-Speed Line | Dallas | TX | — | Construction Documents | $18.0B | 2026-06-01 | 2029-01-30 |
| Eastern Quebec Wind Power Development | Gaspe | QC | — | Pre-Design | $18.0B | 2027-11-15 | 2030-07-13 |
| Argent LNG Facility / Port Fourchon | Golden Meadow | LA | — | Pre-Design | $18.0B | 2026-10-05 | 2029-06-02 |
| Samsung Austin Semiconductor Wafer Fabricati… | Taylor | TX | — | Pre-Design | $17.5B | 2029-01-01 | 2031-08-01 |
| Project Sail / Newnan | Newnan | GA | — | Pre-Design | $17.2B | 2026-08-17 | 2028-09-29 |
| Walt Disney Worlds Fifth Park | Kissimmee | FL | — | Pre-Design | $17.0B | 2035-01-01 | 2037-11-15 |
| EdgeCore Data Center / Shannon Hill Regional… | Louisa | VA | — | Pre-Design | $17.0B | 2026-08-27 | 2028-10-09 |
| Pathways Alliance - Foundational CCS Project | Cold Lake | AB | — | Design Development | $16.5B | 2026-10-16 | 2029-11-30 |
| Samsung Austin Semiconductor Wafer Fabricati… | Taylor | TX | — | Pre-Design | $16.5B | 2029-01-01 | 2031-08-01 |
| EverWind Green Hydrogen & Ammonia Plant - Bu… | Marystown | NF | — | Construction Documents | $16.0B | 2028-11-17 | 2029-04-30 |
| Anderson County Natural Gas Power Generation… | Palestine | TX | — | Pre-Design | $16.0B | 2026-09-09 | 2029-05-07 |
| Samsung Austin Semiconductor Wafer Fabricati… | Taylor | TX | — | Pre-Design | $15.5B | 2029-01-10 | 2031-08-10 |
| DoD Electric Boat Navy Submarine Contract / … | Providence | RI | — | Pre-Design | $15.4B | 2026-09-01 | 2028-08-26 |
| Samsung Austin Semiconductor Wafer Fabricati… | Taylor | TX | — | Pre-Design | $15.1B | 2026-08-19 | 2029-03-18 |
| Pennsylvania Digital I (PAX-1) Data Center D… | Carlisle Brks | PA | — | Pre-Design | $15.0B | 2026-06-30 | 2031-09-30 |
| HyperGrid AI Mega Campus | Amarillo | TX | — | Schematic Design | $15.0B | 2026-02-24 | 2026-12-31 |
| 61st Ave Data Center Development | Hobart | IN | — | Pre-Design | $15.0B | 2027-07-30 | 2029-09-11 |
| Google Mixed-use Development / San Jose | San Jose | CA | — | Pre-Design | $15.0B | 2026-10-26 | 2039-12-30 |
| Pennsylvania Digital 1 or PAX-1 Data Center | South Middleton Township | PA | — | Pre-Design | $15.0B | 2026-08-31 | 2028-10-13 |
| Project Marvel Data Storage Center / Bessemer | Bessemer | AL | — | Pre-Design | $14.4B | 2026-09-01 | 2028-10-14 |
| Big Sky Data Center Campus | Broadview | MT | — | Pre-Design | $14.4B | 2026-12-01 | 2029-01-13 |
| Second Avenue Subway Phase 3 - MTA - New Yor… | New York | NY | — | Pre-Design | $14.2B | 2027-06-01 | 2030-01-30 |
| Bay du Nord Oil Facility Development Project | North West River | NF | — | Pre-Design | $14.0B | 2030-05-01 | 2032-11-28 |
| Sempra Infrastructure - Port Arthur Liquefie… | Port Arthur | TX | — | Construction Underway | $14.0B | 2025-10-06 | 2030-08-16 |
| Southern Nevada Supplemental Airport (SNSA) | Las Vegas | NV | — | Pre-Design | $14.0B | 2029-01-01 | 2036-12-31 |
| Toyota Battery Plant at Greensboro Randolph … | Liberty | NC | — | Construction Underway | $13.9B | 2022-01-24 | 2025-11-07 |
| Sentinel Grove Technology Park / Project Jar… | Fort Pierce | FL | — | Pre-Design | $13.5B | 2027-04-12 | 2029-05-25 |
| Microsoft Data Center Expansion - Microsoft | Mount Pleasant | WI | — | Pre-Design | $13.3B | 2027-01-01 | 2029-02-13 |
| Raise / Elevate Embarcadero and Waterfront -… | San Francisco | CA | CIVIL | Design Development | $13.0B | 2027-02-02 | 2029-04-17 |
| SMS: BART Silicon Valley Phase II (BSVII) Co… | San Jose | CA | — | Construction Documents | $12.7B | 2026-07-01 | 2029-03-01 |
| Entrata Data Center / Kingman | White Hills | AZ | — | Pre-Design | $12.5B | 2027-01-04 | 2029-02-16 |
| Blackstone Data Center | Phoenix | AZ | — | Construction Underway | $12.5B | 2025-01-06 | 2026-02-19 |
| Samsung Austin Semiconductor Wafer Fabricati… | Manor | TX | — | Pre-Design | $12.5B | 2029-01-11 | 2031-08-11 |
| Formosa Plastics Sunshine Project | Saint James | LA | — | Construction Documents | $12.0B | 2027-03-01 | 2029-09-28 |
| Taiwan Semiconductor Manufacturing Company -… | Phoenix | AZ | INDUSTRIAL | Construction Underway | $12.0B | 2021-05-01 | 2024-01-31 |
| BART Silicon Valley Phase II Extension Progr… | San Jose | CA | — | Post Bid | $12.0B | 2025-06-02 | 2028-05-22 |
| Samsung Austin Semiconductor Wafer Fabricati… | Manor | TX | — | Pre-Design | $12.0B | 2029-01-11 | 2031-08-11 |
| BART Silicon Valley Phase II Extension Progr… | San Jose | CA | — | Construction Underway | $12.0B | 2025-05-05 | 2028-04-24 |
| Hudson Yards West | New York | NY | — | Design Development | $12.0B | 2026-07-20 | 2030-01-02 |
| Pacific Future Energy Refinery Project | Terrace | BC | — | Pre-Design | $12.0B | 2026-01-01 | 2028-07-31 |
| Red Wolf Data Center | Kansas City | KS | — | Schematic Design | $12.0B | 2026-06-05 | 2028-07-18 |
| Project Hummingbird - Data Center Campus | Monongahela Township | PA | — | Pre-Design | $12.0B | 2026-10-01 | 2028-12-29 |
| Project West Data Center Development - Norwa… | Norwalk | IA | — | Pre-Design | $12.0B | 2026-09-01 | 2028-10-14 |
| Zenith Volts Data Center | Roswell | NM | — | Pre-Design | $11.7B | 2026-06-01 | 2027-11-01 |
| White Oak Technology Park (Data Center) - Gr… | Grovetown | GA | — | Pre-Design | $11.6B | 2026-12-01 | 2029-01-13 |
| Dow Chemical - Path2Zero Project | Fort Saskatchewan | AB | — | Construction Underway | $11.5B | 2024-06-06 | 2029-12-31 |
| LFAB2 | Lehi | UT | — | Construction Underway | $11.0B | 2023-11-02 | 2025-06-01 |
| Amazon Web Services - Indiana Enterprise Cen… | New Carlisle | IN | — | Construction Underway | $11.0B | 2024-11-04 | 2025-12-18 |
| Project Bus - Atlas Development | Temple | GA | — | Pre-Design | $11.0B | 2026-07-28 | 2036-12-31 |
| Amazon Web Services Data Center / Covington | Covington | GA | — | Pre-Design | $11.0B | 2026-08-17 | 2028-09-29 |
| Logix I Campus | Frankfort | IN | — | Pre-Design | $10.0B | 2026-12-28 | 2029-02-09 |
| LVXP Mixed-Use Development | Las Vegas | NV | — | Construction Documents | $10.0B | 2026-04-02 | 2028-09-26 |
| Green Corridors Laredo Intelligent Freight T… | Laredo | TX | — | Pre-Design | $10.0B | 2026-10-13 | 2030-06-03 |
| AWS Data Center Campus - Amazon Web Services | New Florence | MO | — | Pre-Design | $10.0B | 2026-07-01 | 2028-08-13 |
| Data Center / Joliet | Joliet | IL | — | Pre-Design | $10.0B | 2027-02-08 | 2029-03-23 |
| Amazon Data Center & AI Campus / Hamlet | Hamlet | NC | — | Construction Underway | $10.0B | 2025-12-17 | 2027-01-30 |
| Rams Village at Warner Center | Los Angeles | CA | — | Schematic Design | $10.0B | 2025-10-13 | 2027-10-15 |
| Richland Parish Meta Data Center | Holly Ridge | LA | — | Construction Underway | $10.0B | 2025-07-02 | 2030-01-31 |
| ExxonMobil Petrochemical Plant | Beaver | PA | CIVIL | Pre-Design | $10.0B | 2024-05-06 | 2026-01-02 |
| Stack Data Center Celebrate Virginia / Frede… | Fredericksburg | VA | — | Pre-Design | $10.0B | 2026-10-02 | 2028-11-14 |
| Homer City Energy Campus | Homer City | PA | — | Construction Underway | $10.0B | 2026-03-09 | 2027-04-05 |
| Moraine Power Generation Project | Whitecourt | AB | — | Design Development | $10.0B | 2026-06-01 | 2029-12-31 |
| Compass Datacenters | Hoffman Estates | IL | — | Construction Underway | $10.0B | 2025-12-01 | 2029-01-26 |
| Project Double Reed at Stamp Site | Alabama | NY | — | Pre-Design | $10.0B | 2026-08-03 | 2028-09-15 |
| Project Phoenix - The Bruce Mansfield Redeve… | Aliquippa | PA | — | Pre-Design | $10.0B | 2028-02-01 | 2032-12-31 |
| RFQ D/B- AFNWC Design and Construction - Sen… | Fe Warren Afb | WY | — | Pre-Design | $10.0B | 2028-01-03 | 2030-09-02 |
| Synapse Data Centre Project | Olds | AB | — | Pre-Design | $10.0B | 2026-10-16 | 2028-11-28 |
| Captus Generation - Pincher Creek CCS Project | Pincher Creek | AB | — | Pre-Design | $10.0B | 2026-10-16 | 2029-06-13 |
| One Beverly Hills Mixed-Use (Residences and … | Beverly Hills | CA | — | Construction Underway | $10.0B | 2025-11-24 | 2028-12-28 |
| Dawson Trails Residential | Castle Rock | CO | — | Construction Documents | $10.0B | 2027-05-03 | 2041-05-01 |
| Meta Data Center / Jefferson Parish | Metairie | LA | — | Construction Underway | $10.0B | 2025-10-01 | 2030-01-07 |
| Louisiana Liquefied Natural Gas (LNG) Produc… | Sulphur | LA | — | Construction Underway | $10.0B | 2022-03-28 | 2029-10-19 |
| Quartier des dialogues Residential and Comme… | Levis | QC | — | Pre-Design | $10.0B | 2027-10-10 | 2031-06-07 |
| Ksi Lisims LNG Project | Nisga'a | BC | — | Schematic Design | $10.0B | 2026-08-03 | 2029-12-31 |
| Meta - Project Domino / Lebanon | Lebanon | IN | — | Construction Underway | $10.0B | 2026-02-11 | 2028-03-26 |
| SMS: RFP D/B - CBP Design-Build Construction… | Washington | DC | — | Post Bid | $10.0B | 2026-11-11 | 2031-11-11 |
| RFP Construction Management - And Related Su… | New York | NY | — | Post Bid | $10.0B | 2029-04-02 | 2031-12-02 |
| NBA Arena, Resort and Casino / Las Vegas | Las Vegas | NV | COMMUNITY | Schematic Design | $10.0B | 2024-10-01 | 2026-03-28 |
| Amazon Data Center Development - Devils Moun… | Kline Township | PA | — | Pre-Design | $10.0B | 2026-06-15 | 2028-07-28 |
| Coastal Virginia Offshore Wind Project / CVOW | Virginia Beach | VA | — | Construction Underway | $9.8B | 2024-06-03 | 2026-12-31 |
| JFK International Airport Redevelopment Expa… | Jamaica | NY | CIVIL | Construction Underway | $9.5B | 2020-01-06 | 2025-01-06 |
| Sepulveda Transit Corridor Project | Los Angeles | CA | — | Construction Documents | $9.5B | 2026-06-08 | 2029-11-21 |
| Purple Line Rail Project | Bethesda | MD | — | Construction Underway | $9.4B | 2021-05-10 | 2023-10-24 |
| Neural Nexus Innovation District | Memphis | TN | — | Pre-Design | $9.4B | 2026-06-30 | 2028-08-12 |
| The Third Link Between The Cities of Quebec … | Quebec | QC | — | Pre-Design | $9.3B | 2028-07-07 | 2030-11-06 |
| Prairie Link High-Speed Rail | Edmonton | AB | — | Pre-Design | $9.0B | 2026-06-01 | 2029-01-30 |
| Google Data Center Expansion / Berkeley Coun… | Moncks Corner | SC | — | Pre-Design | $9.0B | 2026-09-15 | 2028-10-28 |
| Mountain Road Tech Park | Glen Allen | VA | — | Pre-Design | $9.0B | 2026-12-01 | 2029-01-13 |
| Rio Grande LNG Facility | Port Isabel | TX | — | Construction Underway | $9.0B | 2023-07-03 | 2025-02-28 |
| Chamouchouane Zone Wind Development Project | Maria-Chapdelaine | QC | — | Pre-Design | $9.0B | 2027-12-15 | 2030-08-12 |
| Trammell Data Center Development Lewis & Cla… | Richland | WA | — | Pre-Design | $9.0B | 2027-01-06 | 2029-02-18 |
| Mactaquac Life Achievement Project - Generat… | Keswick Ridge | NB | — | Design Development | $9.0B | 2029-07-02 | 2032-02-28 |
| Google Data Center / Chesterfield | Chester | VA | — | Construction Documents | $9.0B | 2026-03-02 | 2028-04-14 |
| Samsung Semiconductor Chipmaking Plant | Taylor | TX | — | Construction Underway | $9.0B | 2022-08-15 | 2026-08-01 |
| Washington Union Station Redevelopment - U.S… | Washington | DC | — | Pre-Design | $8.8B | 2027-06-01 | 2030-01-30 |
| Emerald Island Resort / Austin | Austin | TX | — | Pre-Design | $8.7B | 2026-10-19 | 2029-09-02 |
| Baltimore Boring Company Tunnel Proposal | Baltimore | MD | — | Pre-Design | $8.5B | 2026-09-18 | 2030-09-07 |
| CP2 LNG | Cameron | LA | — | Construction Underway | $8.5B | 2025-06-03 | 2027-06-07 |
| Forsyth Technology Campus Development | Forsyth | GA | — | Pre-Design | $8.4B | 2029-03-05 | 2035-03-05 |
| Bronzeville Lakefront Mixed-Use Development … | Chicago | IL | — | Design Development | $8.2B | 2026-10-01 | 2035-08-15 |
| Brightline West High Speed Rail | Fish Springs | NV | — | Construction Documents | $8.0B | 2025-10-01 | 2027-06-02 |
| Jackpine Mine Expansion | Fort McMurray | AB | — | Pre-Design | $8.0B | 2028-10-16 | 2031-05-16 |
| Serverfarm ARK1 Data Center Development | Clarksville | AR | — | Construction Documents | $8.0B | 2026-04-01 | 2028-05-14 |
| Metropolitan Park | New York | NY | — | Design Development | $8.0B | 2026-04-01 | 2028-09-25 |
| LYNX Silver Line Rail Trail | Charlotte | NC | — | Pre-Design | $8.0B | 2030-03-04 | 2033-08-17 |
| Brightline West High-Speed Rail / Las Vegas | Las Vegas | NV | — | Construction Documents | $8.0B | 2026-05-04 | 2029-01-02 |
| Taiwan Semiconductor Manufacturing Company -… | Phoenix | AZ | — | Construction Underway | $8.0B | 2022-12-02 | 2026-03-02 |
| New Chesapeake Bay Bridge - Maryland Transpo… | Annapolis | MD | — | Pre-Design | $8.0B | 2030-03-04 | 2032-07-03 |
| EverWind Green Hydrogen & Ammonia Plant - Po… | Port Hood | NS | — | Construction Documents | $8.0B | 2026-10-16 | 2028-11-15 |
| SMS: RFP - Design-Build (DB)/Design-Bid-Buil… | Jb Pearl Harbor Hickam | HI | — | General Contractor Award | $8.0B | 2025-05-26 | 2030-05-26 |
| Metropolitan Park Hard Rock Hotel & Casino M… | New York | NY | — | Schematic Design | $8.0B | 2026-03-02 | 2028-08-26 |
| ECL TerraSite TX-1 Hydrogen Powered Data Cen… | Cleveland | TX | — | Pre-Design | $8.0B | 2026-04-14 | 2028-05-27 |
| Intel Chandler Ocotillo Campus Expansion | Chandler | AZ | — | Construction Underway | $8.0B | 2021-09-20 | 2024-06-03 |
| Willow Bear Tooth Alaska Oil Project | Prudhoe Bay | AK | CIVIL | Construction Underway | $8.0B | 2023-12-27 | 2025-06-19 |
| I-5 Columbia River Bridge | Vancouver | WA | — | Design Development | $7.7B | 2028-03-01 | 2032-12-31 |
| VIA Rail Canada High Frequency Rail Project … | Quebec | QC | — | Pre-Design | $7.6B | 2030-07-15 | 2033-07-15 |
| Amazon Northeast Creek Technology Campus | Mineral | VA | — | Construction Underway | $7.6B | 2025-12-01 | 2027-01-14 |
| PTTGC America Ethane Cracker Plant | Shadyside | OH | INDUSTRIAL | Construction Documents | $7.5B | 2025-01-06 | 2026-08-06 |
| Citroniq Chemicals LLC Plastics Manufacturin… | Falls City | NE | — | Pre-Design | $7.5B | 2026-12-07 | 2029-03-21 |
| Road Improvement I-35 From U.S. Route 290 Ea… | Austin | TX | — | Design Development | $7.5B | 2024-07-12 | 2025-04-29 |
| Tract Data Center - Buckeye Tech Corridor | Buckeye | AZ | — | Pre-Design | $7.4B | 2027-01-25 | 2029-03-09 |
| Interstate 5 Bridge Replacement Program - Wa… | Vancouver | WA | — | Design Development | $7.2B | 2026-01-10 | 2028-05-11 |
| GlobalFoundries Expansion | Malta | NY | — | Schematic Design | $7.0B | 2025-09-01 | 2027-04-01 |
| Matagorda e-Fuels Facility | Bay City | TX | — | Construction Documents | $7.0B | 2026-03-02 | 2028-09-29 |
| RFP - New York Penn Station Transformation P… | New York | NY | — | Pre-Design | $7.0B | 2027-12-01 | 2030-08-01 |
| Nacero Gasoline Manufacturing Development / … | Penwell | TX | — | Pre-Design | $7.0B | 2026-12-01 | 2029-06-30 |
| Halo Vista Mixed Use Development | Phoenix | AZ | — | Pre-Design | $7.0B | 2026-05-25 | 2029-05-26 |
| Penn America Energy Liquid Natural Gas Plant | Chester Township | PA | — | Pre-Design | $7.0B | 2026-06-08 | 2029-02-03 |
| The 78 | Chicago | IL | — | Design Development | $7.0B | 2026-02-02 | 2029-02-03 |
| Ontario Pumped Storage Project | Meaford | ON | — | Pre-Design | $7.0B | 2029-06-15 | 2030-02-28 |
| Avemore Data Center / Villa Rica | Villa Rica | GA | — | Pre-Design | $7.0B | 2028-01-03 | 2028-12-25 |
| The 1901 Project | Chicago | IL | — | Schematic Design | $7.0B | 2027-12-02 | 2030-03-01 |
| Micron Technology Semiconductor Fabrication … | Boise | ID | INDUSTRIAL | Construction Underway | $7.0B | 2023-09-01 | 2025-03-31 |
| Amkor Technology Semiconductor Packaging Fac… | Peoria | AZ | — | Construction Underway | $7.0B | 2025-10-15 | 2034-09-04 |
| Red Line Commuter Rail - Charlotte Area Tran… | Charlotte | NC | — | Design Development | $7.0B | 2028-05-01 | 2031-10-15 |
| Beacon AI Centers - Heartland Project | Gibbons | AB | — | Design Development | $7.0B | 2026-10-16 | 2027-11-30 |
| Hall Park | Frisco | TX | — | Construction Underway | $7.0B | 2022-06-06 | 2024-04-26 |
| Project Tripletail | Eagle Mountain | UT | — | Pre-Design | $7.0B | 2028-06-30 | 2030-08-13 |
| St. Thomas Battery Cell Manufacturing Plant … | St Thomas | ON | — | Construction Underway | $7.0B | 2025-10-20 | 2027-10-29 |
| Cologix Data Campus / Johnstown | Johnstown | OH | — | Design Development | $7.0B | 2026-05-25 | 2028-07-07 |
| Construction of Tramway Transportation Lines… | Montreal | QC | — | Pre-Design | $6.7B | 2027-06-15 | 2030-11-28 |
| EV Factory / Social Circle | Social Circle | GA | — | Pre-Design | $6.6B | 2026-06-01 | 2028-12-29 |
| Korea Zinc Smelting Factory / Clarksville | Clarksville | TN | — | Pre-Design | $6.6B | 2027-03-01 | 2029-12-31 |
| Marpole Transit Centre Construction | Vancouver | BC | — | Construction Underway | $6.5B | 2022-11-01 | 2028-12-29 |
| RFQ Contractor - TransLink - Marpole Transit… | Vancouver | BC | — | Post Bid | $6.5B | 2025-09-22 | 2027-05-24 |
| Eli Lilly Manufacturing Facility / Houston | Houston | TX | — | Pre-Design | $6.5B | 2026-08-03 | 2030-12-02 |
| Related Santa Clara (Formerly City Place) | Santa Clara | CA | — | Construction Documents | $6.5B | 2026-08-03 | 2028-01-03 |
| BART Extension Phase II - Bart to Sillicon V… | Santa Clara | CA | — | Construction Documents | $6.5B | 2024-07-08 | 2028-11-03 |
| Trenton Liquid Natural Gas Manufacturing Fac… | Trenton | ND | — | Pre-Design | $6.4B | 2026-09-16 | 2027-09-14 |
| Phase II - Energy Storage Solutions Data Cen… | Tarboro | NC | — | Pre-Design | $6.4B | 2027-10-01 | 2029-11-13 |
| Energy Storage Solutions Data Center / Edgec… | Tarboro | NC | — | Pre-Design | $6.4B | 2026-10-01 | 2028-11-13 |
| Dobson Farms West | Florence | AZ | — | Design Development | $6.4B | 2027-03-08 | 2029-10-05 |
| Crusoe Data Center Building 10 Core & Shell … | Abilene | TX | — | Construction Documents | $6.3B | 2026-06-01 | 2027-05-03 |